17,005 Documents in our Technical Library
2464424 Total Downloads

Newest Additions

NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
AA-CP-20212-001
AA-CP-20212-001
ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...

NASA-CEH-APP-Q

NASA-CEH-APP-Q
  • Version
  • 174 Downloads
  • 229.57 KB File Size
  • 1 File Count
  • August 14, 2016 Create Date
  • August 14, 2016 Last Updated
Scroll for Details

Appendix Q; Glossary

NASA-CEH-APP-Q Appendix Q; Glossary

Appendix Q: Glossary

Analogy

A currently fielded system similar in design and/or operation to the proposed system. The cost of
the proposed system is developed by taking the fielded system’s data and adjusting them to
account for any differences. Analogous estimates are also called comparative or extrapolated
estimates.

Analysis of Alternatives (AoA)

An AoA broadly examines multiple elements of project or program alternatives including technical
risk, maturity, and costs. AoAs are intended to illuminate the risk, uncertainty, and relative
advantages and disadvantages of the alternatives being considered; they show the sensitivity of
each alternative to possible changes in key assumptions, and they aid decision makers in judging
whether any of the proposed alternatives offer sufficient operational and/or economic benefit to
be worth the cost.

Announcement of Opportunity (A0)

A mechanism used to solicit proposals for unique, high-cost research investigation opportunities
that typically involve flying experimental hardware provided by the bidder on one of NASA’s
Earth—orbiting or free—flying space flight missions. Scope selection through AOs can require
development periods of many years and involve budgets of many millions of dollars for the largest
programs. Selections are usually awarded through contracts, even for nonprofit organizations,
although occasionally grants are also used.

Baseline

The technical performance and content, technology application, schedule milestones, and budget
(including Unallocated Future Expenses [UFEs]) that are documented in the approved program
and project plans.

Beta Curve

A method that can be used to spread parametrically derived cost estimates. The Beta Curve’s
shape can be tailored by modifying two parameters: cost fraction and peakedness.

Business Case Analysis (BCA)

A method to aid decision makers in the comparison of alternative approaches, options, or
projects. A BCA considers not only all Life-Cycle Costs (LCCs) identified by a Life-Cycle Cost
Estimate (LCCE), but also other quantifiable and nonquantifiable benefits for all possible
alternatives.

Coefficient of Determination (R2)

In the context of statistical models, this is the proportion of variability in a dataset accounted for
by the statistical model. In cost estimating, it provides a measure of how well cost estimates are
likely to be predicted by the model. R2 ranges from 0 (no relationship) to 1 (perfect relationship).

Compounding

The process of going from today’s values, or present values (PVs), to future values (FVs).

Appendix Q
Glossary 0-1 February 2015
NASA Cost Estimating Handbook 4.0

Constant Year (CY) Dollars

An analytical technique that translates a real year (RY) dollar estimate (the year expenses were
realized) to a single-year value by discounting the effects of inflation. A figure expressed in CY
dollars reflects the present value of a single year. Cost models are developed by normalizing
actual costs to remove the effects of inflation from historical data points. Those data points are
then used to develop the model. Cost estimating results are thus informed by CY values.

Cost Analysis Data Requirement (CADRe)

A document that captures the technical, cost, and schedule scope associated with selected
project key decision points (KDPs) in a consistent format and utilizes a consistent Work
Breakdown Structure (WBS). CADRe ensures the consistent capture of project data for the
development of future cost and schedule estimates.

Cost As an Independent Variable (CAIV)

The process of examining cost drivers by holding cost independent of other technical parameters.
CAIV is founded upon two primary principles: first, system costs are constrained; and second,
“trade space" is the foundation for smart decisions. Trade space is the range of alternatives
available to decision makers. It is four-dimensional, comprising performance, cost, schedule, and
risk impacts.

Coefficient of Variation (CV)

A normalized measure of the dispersion of a probability distribution. The absolute value of the CV
is sometimes known as relative standard deviation (RSD), which is expressed as a percentage.

Correlation

A statistical technique used to determine the degree to which variables are related or associated.
Correlation does not prove or disprove a cause-and—effect relationship.

Cost Benefit Analysis (CBA)

An analytic technique that compares the costs and benefits of investments, programs, or policy
actions in order to determine which alternative(s) maximize net profits. Net benefits of an
alternative are determined by subtracting the present value of costs from the present value of
benefits. Guidance for Cost Benefit Analysis for Government programs is provided in OMB
Circular A-94.

Cost Breakdown Structure (CBS)

A preliminary Work Breakdown Structure (WBS) produced by a cost estimator to facilitate the
generation of a cost estimate prior to the development of a project WBS. The CBS should be
consistent with the NASA standard Level 2 WBS.

Cost Driver
Input variables for a cost estimating model that will have a significant effect on the cost estimate.
Cost Estimate

The result of applying quantitative techniques to calculate and forecast development, production,
operation, and disposal costs within a scheduled timeframe and defined scope for a given project.

Appendix Q
Glossary Q-2 February 2015
NASA Cost Estimating Handbook 4.0

Cost Estimating Relationship (CER)

A mathematical relationship that defines cost as a function of one or more independent
parameters such as performance, operating characteristics, or physical characteristics.

Cost of First Unit

The expected or known cost of the first unit produced or delivered in a multi-unit production. In
learning curve theory, this unit is expected to be the most expensive of the production and often
used as the basis for adjusted cost projections of later units.

Cost Risk

Risk due to statistical uncertainty in the cost estimating methodology, technical parameters,
economic factors, rates, and schedule, as well as programmatic and technological factors.

Cumulative Distribution Function (CDF) (also known as “S-curve”)

Describes the probability that a real-valued random variable, X, with a given probability
distribution will be found at a value less than or equal to x. CDFs are used to specify the
distribution of multivariate random variables.

Discount Factor (also called the Discount Rate)

The factor that is used to translate values from different time periods so that they may be
combined into a single number. Discount rates are used to calculate present value (PV).

Discounted Cash Flow (DCF)
Refers to a cash flow summary that has been adjusted to reflect the time value of money.
Earned Value Management/Earned Value Management System (EVMIEVMS)

A management technique and system utilized to relate resources to schedules. Work is planned,
budgeted, and scheduled in time-phased increments, producing a cost and schedule
measurement baseline. The EVMS enables the evaluation of the deviation and enables the
forecasting of the resulting cost and schedule performance.

Estimate at Completion (EAC)

The actual cost of work completed to date plus the predicted costs and schedule for finishing the
remaining work. It can also be the expected total cost of an activity, a group of activities, or the
project when the defined scope of work is completed.

Estimate To Complete (ETC)

The expected cost to complete all the remaining work for a schedule activity, Work Breakdown
Structure (WBS) component, or project.

Fixed Cost

The costs of an activity (manufacturing, production, assembly, operation, maintenance, etc.) that
do not vary significantly with the measure of the product or service output. Though these costs
will be incurred regardless of the output of the system, the starting point scope of fixed costs is
often determined by factors that can be controlled, such as design, capacity planning, and
infrastructure scope and business process steps.

Appendix Q
Glossary Q-3 February 2015
NASA Cost Estimating Handbook 4.0

Functional Breakdown Structure (FBS)

A structural alternative to a Work Breakdown Structure (WBS) that can be used for estimating
cost. The FBS is organized by functions that must be performed to produce a product, whereas a
WBS is broken down by the end products themselves. The activities-based structure is not tied to
any particular architecture because it is a listing of the needed functions, not the elements, of the
architecture.

Future Value (FV)

A financial term that establishes the value of an asset or set of cash flows at a future point,
assuming certain interest rates. FV does not include corrections for inflation. FV is used to
calculate the time value of money.

Grassroots Estimate

The estimate generated by computing the value of labor and materials for each Work Breakdown
Structure (WBS) line item. It is also referred to as “bottom-up” or engineering buildup estimating.

Ground Rules and Assumptions (GR&A)

A description of features that bound the cost estimates for a specified technical and programmatic
scope. These allow the estimator to clearly communicate the content of the estimate to customers
and stakeholders.

Homoscedasticity

A statistical assumption that the variance of error is constant across the data (a necessary
assumption in the use of Ordinary Least Squares [OLS] regression techniques).

Inflation

The rise in the general level of prices of goods and services over time. Increases in inflation
represent an erosion of the purchasing power of money. The inflation rate is an annualized
percentage change in a price index over time.

Interest

A fee charged for the use of money or capital paid by a borrower to a lender as a form of
compensation for the use of the assets.

Internal Rate of Return (IRR)

A metric used in capital budgeting to measure and compare the profitability of alternate
investments. It is also known as an effective interest rate or a discounted cash flow rate of return.
The IRR is the annualized effective compounded rate of return that makes the net present value
(NPV) of all cash flows from a particular investment equal to zero.

Joint Cost and Schedule Confidence Level (JCL)

A cost and schedule condition in which there is the probability that a given project or program’s
cost will be equal to or less than the targeted cost and the schedule will be equal to or less than
the targeted schedule for completion for a specified confidence level.

Appendix Q
Glossary Q-4 February 2015
NASA Cost Estimating Handbook 4.0

Learning Curve

The assumption that the more times tasks are performed, the less time will be required for each
of the successive iterations, hence reducing the cost estimate. Learning curves can be calculated
through several different equations. How a learning curve applies to the space sector is
questionable where fewer items, rather than multiple items in a mass-production environment, are
fabricated.

Lease-versus-Buy Decision

A specialized type of trade study that enables a decision to minimize Life-Cycle Cost (LCC)
outlays by comparing the cash flows associated with each alternative and assessing the best
value. This specialized Business Case Analysis (BCA) is typically applied to information
technology (IT) and facilities.

Level of Effort (LOE)

A support activity that must be done to support other efforts. It typically involves work that must
be periodically repeated. The duration is generally from the start to the finish of the effort being
supported. An LOE task should never be on a project’s critical path.

Life-Cycle Cost (LCC)

The total cost for all phases of a project or system, including design, development, verification,
production, operations, maintenance, and disposal. NASA has included a detailed definition of
project LCC in NPD 7120.5E. For more information, visit
http://nodisS.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=7120&s=5E.

Linear Regression

A statistical approach to modeling the relationship between a dependent variable and one or
more explanatory variables. This is employed in the development and use of parametric cost
estimating tools.

Make-versus-Buy Decision

An analysis that supports make-or-buy decisions, including both financial and strategic
considerations, such as whether the element is critical to the success of the project, whether it fits
into the desired future core competencies of the organization, or whether the item is so
specialized that there are few or no other suppliers.

Margin

An allowance that is carried in budgets (now referred to as Unallocated Future Expenses [UFEs]),
as well as in schedule and technical performance parameters, to provide for uncertainties and
risks. Margins are typically established as a baseline in formulation and consumed as the project
progresses through its life cycle.

Model

A representation of a system broken into its component factors, or parts, so as to mimic or
behave as the actual system would, were such parts or factors to be varied and intermixed. A
model is used to gain knowledge about a system without actually executing the system.

Appendix Q
Glossary Q-5 February 2015
NASA Cost Estimating Handbook 4.0

Monte Carlo Simulation

A class of computational algorithms relying on repeated random sampling to compute results.
This simulation method is most suited to uses where there are many coupled degrees of freedom
and significant uncertainty in inputs.

Multivariate Regression

A mathematical modeling technique that relates two or more independent variables to a
dependent variable through a predetermined equation that minimizes the sum of the squared
error.

Multicollinearity

A statistical phenomenon in which two or more predictor variables in a multiple regression model
are highly correlated. In this state, the coefficient estimates may change erratically in response to
small changes in the model or the data, thus potentially rendering calculations of individual
predictors invalid.

NASA Research Announcement (NRA)

A mechanism used to announce research opportunities in support of NASA’s programs.
Respondents prepare proposals based on their ideas, unlike proposal responses to a specific
Statement of Work (SOW) issued as a part of a Request for Proposal (RFP) process. NRA
proposals may result in awards of grants, contracts, or cooperative agreements.

Net Present Value (NPV)

The sum of the present values (a time-series of incoming and outgoing cash flows) minus the
present value of the initial investment.

Nominal Discount Rate
The term for a real discount rate that has been adjusted to reflect anticipated inflation rates.
Nonlinear Regression

A statistical technique of modeling a nonlinear functional relationship in which observational data
are modeled by a function that is a nonlinear combination of the model parameters and
dependent on one or more independent variables.

Normalize/Normalization

Analysis to adjust data to a common predetermined basis. Cost data are frequently normalized to
remove the effects of inflation, for example.

Ordinary Least Squares (OLS)

A statistical technique for estimating the unknown parameters in a linear regression model that
minimizes the sum of squared distances between observed responses in a dataset and the
responses predicted by the linear approximation. Where there is no multicollinearity and errors
are homoscedastic and have a normal distribution, OLS is the maximum likelihood estimator.

Organizational Breakdown Structure (OBS)

A method of organizing costs or plans by the organizational units that perform the work. The OBS
is frequently the basis for tracking fiscal performance where the Work Breakdown Structure
(WBS) is used to organize the end items or work.

Appendix Q
Glossary Q-6 February 2015
NASA Cost Estimating Handbook 4.0

Parametric Cost Estimate

An estimate generated by methods utilizing statistical relationships between historical costs and
other project variables such as a system’s physical or performance characteristics.

Payback Period

The time required for the cumulative value of savings to equal the cumulative value of the
investment. Achievement of payback is sometimes referred to as the “break-even point."

Present Value (PV)

The value on a given date (present) of a payment or series of payments made at other times.
Future cash flows are discounted to reflect the time value of money or investment risk. PV
calculations are used to provide a means to compare the cash flows of various alternatives.

Probabilistic Cost or Schedule Estimate

An estimate that incorporates risks, uncertainties, and Monte Carlo simulations to provide a
cumulative distribution function (S—curve) of the probability of a variable with a given probability
distribution being less than or equal to a value.

Probability Density Function (PDF)

A function that describes the relative likelihood for a random variable to have a given value. The
probability for the random variable to fall within a particular region is given by the integral of the
variable’s density over the region. It is not negative, and its integral over the entire space is equal
to one.

Real Discount Rate

The adjustment of a discount rate to eliminate the effects of expected inflation. It is used to
discount CY dollars, real benefits, or costs.

Regression Analysis

An analysis that explains how the value of a dependent variable changes when any one of the
independent variables is changed while the other independent variables are held constant. Linear
regression and Ordinary Least Squares (OLS) regression are parametric in that the regression
function is defined in terms of a finite number of parameters that are estimated from the data.

Request for Proposal (RFP)

A contractual document that provides a formal invitation to submit a proposal for a scope of work
with the intent of forming a contract.

Return on Investment (ROI)

The ratio of money gained or lost on an investment relative to the money invested, which is
normally expressed as a percentage. The ratio is sometimes referred to as a Rate of Return

(ROR).

Risk
The chance of uncertainty or loss. Where there are potentially favorable and unfavorable events,
risk is the probability that an unfavorable event will occur.

Appendix Q

Glossary Q-7 February 2015
NASA Cost Estimating Handbook 4.0

Rough Order of Magnitude (ROM)
An estimate based on an approximation without benefit of details or detailed analysis.
Schedule Assessment

Schedule assessment is the process of determining schedule validity and performance at a given
point in time. A thorough schedule assessment using many of the techniques described in the
following paragraphs should always be performed prior to establishing the IMS baseline and is
essential in ensuring a quality JCL analysis. Periodic assessment is also necessary to gain
assurance that the schedule continues to generate valid data and to support the project’s
objectives throughout the project life cycle. A reliable schedule assessment checklist is an
important aid that can benefit a project team or outside review team in determining schedule
validity.

Schedule Estimating Relationship (SER)

A mathematical relationship that defines schedule as a function of one or more parameters or
factors, which may include technical parameters as well as parameters for cost. The development
and use of SERs within NASA is substantially less mature than the use of CERs.

Sensitivity Analysis

An analytical technique used to measure the uncertainty in the output of a model relative to
different sources of uncertainty in model inputs. Varying the input parameters and evaluating the
changes in the outputs enables an analyst to evaluate the relationship between the inputs and
outputs (testing the model) and the effects of those variations on the conclusions derived from the
model.

Simulation

The imitation of a real—world process or system over time. The initial step requires the
development of a mathematical model that represents key characteristics or behaviors of the
system or process over time.

Software Cost Estimating

An effort that requires identical processes as the estimation of hardware, but utilizes different
measures and tools.

Then Year (TY) Dollars

The values associated with costs or estimates in the year that they are planned or occur (also
called RY dollars). These costs include any projected or experienced inflation, as opposed to CY
dollars, which provide total costs from a cash flow in a single-year base (deflated or inflated).

Time-Phased Cost
Costs that have been allocated to a schedule or time period.
Time Value of Money

The value of money, including a given amount of interest earned over a given amount of time.
This core concept in financial analysis enables the calculation of present value and its derivatives.

Appendix Q
Glossary Q-8 February 2015
NASA Cost Estimating Handbook 4.0

Total Cost of Ownership (TCO)

The total cost of an investment over a life cycle, including development, operations, maintenance,
upgrades, and decommissioning.

Trade Study

The techniques utilized to compare alternatives as part of the decision to select the preferred
alternative(s). These studies may range from formal Analyses of Alternatives (AoA) to informal
quantitative analyses.

Technology Readiness Level (TRL)

A common scale that describes the maturity of a technology, which is utilized as an input in
planning development efforts. Many cost and schedule estimation models utilize TRL as an input
parameter.

Unallocated Future Expense (UFE)

Funding that is provided to accommodate the realization of risk and uncertainty associated with a
cost or schedule estimate. These funds may ultimately be distributed to mitigate the risk, to make
the product work, or to accommodate cost or schedule growth, but, because not all risks or
uncertainties will be realized, initial allocation of funds to particular WBS elements would be
premature. UFE is established by exercising probabilistic techniques.

Uncertainty

The indefiniteness about the outcome of a situation. There is uncertainty about both favorable
and unfavorable events. The uncertainty must be understood in order to assess risk.

Value Engineering

A systematic effort to improve the value of goods or services utilizing an examination of the
function. Value can be increased by either improving the function or reducing cost while
preserving basic functions.

Variable Cost

Costs that change in proportion to the activity of the effort. The concept is useful in forecasting
the impact of performance when planned baselines are not achieved.

Work Breakdown Structure (WBS)

A means of organizing all project or program components into a product-oriented structure that
can be used to establish work packages for project cost and schedule baselines.

Wrap Rate

In NASA cost estimating language, major relatively fixed-cost components such as project
management, systems engineering, and safety and mission assurance are referred to as wraps.
The components of the wrap rate will vary from model to model. In many parametric cost models,
the cost of these elements is calculated as a function of the cost of the hardware and software.

FileAction
NASA-CEH-APP-Q Appendix Q; Glossary.pdfDownload 

Comment On This Post

Your email address will not be published. Required fields are marked *

NASA-CEH-APP-Q

NASA-CEH-APP-Q
  • Version
  • 174 Downloads
  • 229.57 KB File Size
  • 1 File Count
  • August 14, 2016 Create Date
  • August 14, 2016 Last Updated
Scroll for Details

Appendix Q; Glossary

NASA-CEH-APP-Q Appendix Q; Glossary

Appendix Q: Glossary

Analogy

A currently fielded system similar in design and/or operation to the proposed system. The cost of
the proposed system is developed by taking the fielded system’s data and adjusting them to
account for any differences. Analogous estimates are also called comparative or extrapolated
estimates.

Analysis of Alternatives (AoA)

An AoA broadly examines multiple elements of project or program alternatives including technical
risk, maturity, and costs. AoAs are intended to illuminate the risk, uncertainty, and relative
advantages and disadvantages of the alternatives being considered; they show the sensitivity of
each alternative to possible changes in key assumptions, and they aid decision makers in judging
whether any of the proposed alternatives offer sufficient operational and/or economic benefit to
be worth the cost.

Announcement of Opportunity (A0)

A mechanism used to solicit proposals for unique, high-cost research investigation opportunities
that typically involve flying experimental hardware provided by the bidder on one of NASA’s
Earth—orbiting or free—flying space flight missions. Scope selection through AOs can require
development periods of many years and involve budgets of many millions of dollars for the largest
programs. Selections are usually awarded through contracts, even for nonprofit organizations,
although occasionally grants are also used.

Baseline

The technical performance and content, technology application, schedule milestones, and budget
(including Unallocated Future Expenses [UFEs]) that are documented in the approved program
and project plans.

Beta Curve

A method that can be used to spread parametrically derived cost estimates. The Beta Curve’s
shape can be tailored by modifying two parameters: cost fraction and peakedness.

Business Case Analysis (BCA)

A method to aid decision makers in the comparison of alternative approaches, options, or
projects. A BCA considers not only all Life-Cycle Costs (LCCs) identified by a Life-Cycle Cost
Estimate (LCCE), but also other quantifiable and nonquantifiable benefits for all possible
alternatives.

Coefficient of Determination (R2)

In the context of statistical models, this is the proportion of variability in a dataset accounted for
by the statistical model. In cost estimating, it provides a measure of how well cost estimates are
likely to be predicted by the model. R2 ranges from 0 (no relationship) to 1 (perfect relationship).

Compounding

The process of going from today’s values, or present values (PVs), to future values (FVs).

Appendix Q
Glossary 0-1 February 2015
NASA Cost Estimating Handbook 4.0

Constant Year (CY) Dollars

An analytical technique that translates a real year (RY) dollar estimate (the year expenses were
realized) to a single-year value by discounting the effects of inflation. A figure expressed in CY
dollars reflects the present value of a single year. Cost models are developed by normalizing
actual costs to remove the effects of inflation from historical data points. Those data points are
then used to develop the model. Cost estimating results are thus informed by CY values.

Cost Analysis Data Requirement (CADRe)

A document that captures the technical, cost, and schedule scope associated with selected
project key decision points (KDPs) in a consistent format and utilizes a consistent Work
Breakdown Structure (WBS). CADRe ensures the consistent capture of project data for the
development of future cost and schedule estimates.

Cost As an Independent Variable (CAIV)

The process of examining cost drivers by holding cost independent of other technical parameters.
CAIV is founded upon two primary principles: first, system costs are constrained; and second,
“trade space" is the foundation for smart decisions. Trade space is the range of alternatives
available to decision makers. It is four-dimensional, comprising performance, cost, schedule, and
risk impacts.

Coefficient of Variation (CV)

A normalized measure of the dispersion of a probability distribution. The absolute value of the CV
is sometimes known as relative standard deviation (RSD), which is expressed as a percentage.

Correlation

A statistical technique used to determine the degree to which variables are related or associated.
Correlation does not prove or disprove a cause-and—effect relationship.

Cost Benefit Analysis (CBA)

An analytic technique that compares the costs and benefits of investments, programs, or policy
actions in order to determine which alternative(s) maximize net profits. Net benefits of an
alternative are determined by subtracting the present value of costs from the present value of
benefits. Guidance for Cost Benefit Analysis for Government programs is provided in OMB
Circular A-94.

Cost Breakdown Structure (CBS)

A preliminary Work Breakdown Structure (WBS) produced by a cost estimator to facilitate the
generation of a cost estimate prior to the development of a project WBS. The CBS should be
consistent with the NASA standard Level 2 WBS.

Cost Driver
Input variables for a cost estimating model that will have a significant effect on the cost estimate.
Cost Estimate

The result of applying quantitative techniques to calculate and forecast development, production,
operation, and disposal costs within a scheduled timeframe and defined scope for a given project.

Appendix Q
Glossary Q-2 February 2015
NASA Cost Estimating Handbook 4.0

Cost Estimating Relationship (CER)

A mathematical relationship that defines cost as a function of one or more independent
parameters such as performance, operating characteristics, or physical characteristics.

Cost of First Unit

The expected or known cost of the first unit produced or delivered in a multi-unit production. In
learning curve theory, this unit is expected to be the most expensive of the production and often
used as the basis for adjusted cost projections of later units.

Cost Risk

Risk due to statistical uncertainty in the cost estimating methodology, technical parameters,
economic factors, rates, and schedule, as well as programmatic and technological factors.

Cumulative Distribution Function (CDF) (also known as “S-curve”)

Describes the probability that a real-valued random variable, X, with a given probability
distribution will be found at a value less than or equal to x. CDFs are used to specify the
distribution of multivariate random variables.

Discount Factor (also called the Discount Rate)

The factor that is used to translate values from different time periods so that they may be
combined into a single number. Discount rates are used to calculate present value (PV).

Discounted Cash Flow (DCF)
Refers to a cash flow summary that has been adjusted to reflect the time value of money.
Earned Value Management/Earned Value Management System (EVMIEVMS)

A management technique and system utilized to relate resources to schedules. Work is planned,
budgeted, and scheduled in time-phased increments, producing a cost and schedule
measurement baseline. The EVMS enables the evaluation of the deviation and enables the
forecasting of the resulting cost and schedule performance.

Estimate at Completion (EAC)

The actual cost of work completed to date plus the predicted costs and schedule for finishing the
remaining work. It can also be the expected total cost of an activity, a group of activities, or the
project when the defined scope of work is completed.

Estimate To Complete (ETC)

The expected cost to complete all the remaining work for a schedule activity, Work Breakdown
Structure (WBS) component, or project.

Fixed Cost

The costs of an activity (manufacturing, production, assembly, operation, maintenance, etc.) that
do not vary significantly with the measure of the product or service output. Though these costs
will be incurred regardless of the output of the system, the starting point scope of fixed costs is
often determined by factors that can be controlled, such as design, capacity planning, and
infrastructure scope and business process steps.

Appendix Q
Glossary Q-3 February 2015
NASA Cost Estimating Handbook 4.0

Functional Breakdown Structure (FBS)

A structural alternative to a Work Breakdown Structure (WBS) that can be used for estimating
cost. The FBS is organized by functions that must be performed to produce a product, whereas a
WBS is broken down by the end products themselves. The activities-based structure is not tied to
any particular architecture because it is a listing of the needed functions, not the elements, of the
architecture.

Future Value (FV)

A financial term that establishes the value of an asset or set of cash flows at a future point,
assuming certain interest rates. FV does not include corrections for inflation. FV is used to
calculate the time value of money.

Grassroots Estimate

The estimate generated by computing the value of labor and materials for each Work Breakdown
Structure (WBS) line item. It is also referred to as “bottom-up” or engineering buildup estimating.

Ground Rules and Assumptions (GR&A)

A description of features that bound the cost estimates for a specified technical and programmatic
scope. These allow the estimator to clearly communicate the content of the estimate to customers
and stakeholders.

Homoscedasticity

A statistical assumption that the variance of error is constant across the data (a necessary
assumption in the use of Ordinary Least Squares [OLS] regression techniques).

Inflation

The rise in the general level of prices of goods and services over time. Increases in inflation
represent an erosion of the purchasing power of money. The inflation rate is an annualized
percentage change in a price index over time.

Interest

A fee charged for the use of money or capital paid by a borrower to a lender as a form of
compensation for the use of the assets.

Internal Rate of Return (IRR)

A metric used in capital budgeting to measure and compare the profitability of alternate
investments. It is also known as an effective interest rate or a discounted cash flow rate of return.
The IRR is the annualized effective compounded rate of return that makes the net present value
(NPV) of all cash flows from a particular investment equal to zero.

Joint Cost and Schedule Confidence Level (JCL)

A cost and schedule condition in which there is the probability that a given project or program’s
cost will be equal to or less than the targeted cost and the schedule will be equal to or less than
the targeted schedule for completion for a specified confidence level.

Appendix Q
Glossary Q-4 February 2015
NASA Cost Estimating Handbook 4.0

Learning Curve

The assumption that the more times tasks are performed, the less time will be required for each
of the successive iterations, hence reducing the cost estimate. Learning curves can be calculated
through several different equations. How a learning curve applies to the space sector is
questionable where fewer items, rather than multiple items in a mass-production environment, are
fabricated.

Lease-versus-Buy Decision

A specialized type of trade study that enables a decision to minimize Life-Cycle Cost (LCC)
outlays by comparing the cash flows associated with each alternative and assessing the best
value. This specialized Business Case Analysis (BCA) is typically applied to information
technology (IT) and facilities.

Level of Effort (LOE)

A support activity that must be done to support other efforts. It typically involves work that must
be periodically repeated. The duration is generally from the start to the finish of the effort being
supported. An LOE task should never be on a project’s critical path.

Life-Cycle Cost (LCC)

The total cost for all phases of a project or system, including design, development, verification,
production, operations, maintenance, and disposal. NASA has included a detailed definition of
project LCC in NPD 7120.5E. For more information, visit
http://nodisS.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=7120&s=5E.

Linear Regression

A statistical approach to modeling the relationship between a dependent variable and one or
more explanatory variables. This is employed in the development and use of parametric cost
estimating tools.

Make-versus-Buy Decision

An analysis that supports make-or-buy decisions, including both financial and strategic
considerations, such as whether the element is critical to the success of the project, whether it fits
into the desired future core competencies of the organization, or whether the item is so
specialized that there are few or no other suppliers.

Margin

An allowance that is carried in budgets (now referred to as Unallocated Future Expenses [UFEs]),
as well as in schedule and technical performance parameters, to provide for uncertainties and
risks. Margins are typically established as a baseline in formulation and consumed as the project
progresses through its life cycle.

Model

A representation of a system broken into its component factors, or parts, so as to mimic or
behave as the actual system would, were such parts or factors to be varied and intermixed. A
model is used to gain knowledge about a system without actually executing the system.

Appendix Q
Glossary Q-5 February 2015
NASA Cost Estimating Handbook 4.0

Monte Carlo Simulation

A class of computational algorithms relying on repeated random sampling to compute results.
This simulation method is most suited to uses where there are many coupled degrees of freedom
and significant uncertainty in inputs.

Multivariate Regression

A mathematical modeling technique that relates two or more independent variables to a
dependent variable through a predetermined equation that minimizes the sum of the squared
error.

Multicollinearity

A statistical phenomenon in which two or more predictor variables in a multiple regression model
are highly correlated. In this state, the coefficient estimates may change erratically in response to
small changes in the model or the data, thus potentially rendering calculations of individual
predictors invalid.

NASA Research Announcement (NRA)

A mechanism used to announce research opportunities in support of NASA’s programs.
Respondents prepare proposals based on their ideas, unlike proposal responses to a specific
Statement of Work (SOW) issued as a part of a Request for Proposal (RFP) process. NRA
proposals may result in awards of grants, contracts, or cooperative agreements.

Net Present Value (NPV)

The sum of the present values (a time-series of incoming and outgoing cash flows) minus the
present value of the initial investment.

Nominal Discount Rate
The term for a real discount rate that has been adjusted to reflect anticipated inflation rates.
Nonlinear Regression

A statistical technique of modeling a nonlinear functional relationship in which observational data
are modeled by a function that is a nonlinear combination of the model parameters and
dependent on one or more independent variables.

Normalize/Normalization

Analysis to adjust data to a common predetermined basis. Cost data are frequently normalized to
remove the effects of inflation, for example.

Ordinary Least Squares (OLS)

A statistical technique for estimating the unknown parameters in a linear regression model that
minimizes the sum of squared distances between observed responses in a dataset and the
responses predicted by the linear approximation. Where there is no multicollinearity and errors
are homoscedastic and have a normal distribution, OLS is the maximum likelihood estimator.

Organizational Breakdown Structure (OBS)

A method of organizing costs or plans by the organizational units that perform the work. The OBS
is frequently the basis for tracking fiscal performance where the Work Breakdown Structure
(WBS) is used to organize the end items or work.

Appendix Q
Glossary Q-6 February 2015
NASA Cost Estimating Handbook 4.0

Parametric Cost Estimate

An estimate generated by methods utilizing statistical relationships between historical costs and
other project variables such as a system’s physical or performance characteristics.

Payback Period

The time required for the cumulative value of savings to equal the cumulative value of the
investment. Achievement of payback is sometimes referred to as the “break-even point."

Present Value (PV)

The value on a given date (present) of a payment or series of payments made at other times.
Future cash flows are discounted to reflect the time value of money or investment risk. PV
calculations are used to provide a means to compare the cash flows of various alternatives.

Probabilistic Cost or Schedule Estimate

An estimate that incorporates risks, uncertainties, and Monte Carlo simulations to provide a
cumulative distribution function (S—curve) of the probability of a variable with a given probability
distribution being less than or equal to a value.

Probability Density Function (PDF)

A function that describes the relative likelihood for a random variable to have a given value. The
probability for the random variable to fall within a particular region is given by the integral of the
variable’s density over the region. It is not negative, and its integral over the entire space is equal
to one.

Real Discount Rate

The adjustment of a discount rate to eliminate the effects of expected inflation. It is used to
discount CY dollars, real benefits, or costs.

Regression Analysis

An analysis that explains how the value of a dependent variable changes when any one of the
independent variables is changed while the other independent variables are held constant. Linear
regression and Ordinary Least Squares (OLS) regression are parametric in that the regression
function is defined in terms of a finite number of parameters that are estimated from the data.

Request for Proposal (RFP)

A contractual document that provides a formal invitation to submit a proposal for a scope of work
with the intent of forming a contract.

Return on Investment (ROI)

The ratio of money gained or lost on an investment relative to the money invested, which is
normally expressed as a percentage. The ratio is sometimes referred to as a Rate of Return

(ROR).

Risk
The chance of uncertainty or loss. Where there are potentially favorable and unfavorable events,
risk is the probability that an unfavorable event will occur.

Appendix Q

Glossary Q-7 February 2015
NASA Cost Estimating Handbook 4.0

Rough Order of Magnitude (ROM)
An estimate based on an approximation without benefit of details or detailed analysis.
Schedule Assessment

Schedule assessment is the process of determining schedule validity and performance at a given
point in time. A thorough schedule assessment using many of the techniques described in the
following paragraphs should always be performed prior to establishing the IMS baseline and is
essential in ensuring a quality JCL analysis. Periodic assessment is also necessary to gain
assurance that the schedule continues to generate valid data and to support the project’s
objectives throughout the project life cycle. A reliable schedule assessment checklist is an
important aid that can benefit a project team or outside review team in determining schedule
validity.

Schedule Estimating Relationship (SER)

A mathematical relationship that defines schedule as a function of one or more parameters or
factors, which may include technical parameters as well as parameters for cost. The development
and use of SERs within NASA is substantially less mature than the use of CERs.

Sensitivity Analysis

An analytical technique used to measure the uncertainty in the output of a model relative to
different sources of uncertainty in model inputs. Varying the input parameters and evaluating the
changes in the outputs enables an analyst to evaluate the relationship between the inputs and
outputs (testing the model) and the effects of those variations on the conclusions derived from the
model.

Simulation

The imitation of a real—world process or system over time. The initial step requires the
development of a mathematical model that represents key characteristics or behaviors of the
system or process over time.

Software Cost Estimating

An effort that requires identical processes as the estimation of hardware, but utilizes different
measures and tools.

Then Year (TY) Dollars

The values associated with costs or estimates in the year that they are planned or occur (also
called RY dollars). These costs include any projected or experienced inflation, as opposed to CY
dollars, which provide total costs from a cash flow in a single-year base (deflated or inflated).

Time-Phased Cost
Costs that have been allocated to a schedule or time period.
Time Value of Money

The value of money, including a given amount of interest earned over a given amount of time.
This core concept in financial analysis enables the calculation of present value and its derivatives.

Appendix Q
Glossary Q-8 February 2015
NASA Cost Estimating Handbook 4.0

Total Cost of Ownership (TCO)

The total cost of an investment over a life cycle, including development, operations, maintenance,
upgrades, and decommissioning.

Trade Study

The techniques utilized to compare alternatives as part of the decision to select the preferred
alternative(s). These studies may range from formal Analyses of Alternatives (AoA) to informal
quantitative analyses.

Technology Readiness Level (TRL)

A common scale that describes the maturity of a technology, which is utilized as an input in
planning development efforts. Many cost and schedule estimation models utilize TRL as an input
parameter.

Unallocated Future Expense (UFE)

Funding that is provided to accommodate the realization of risk and uncertainty associated with a
cost or schedule estimate. These funds may ultimately be distributed to mitigate the risk, to make
the product work, or to accommodate cost or schedule growth, but, because not all risks or
uncertainties will be realized, initial allocation of funds to particular WBS elements would be
premature. UFE is established by exercising probabilistic techniques.

Uncertainty

The indefiniteness about the outcome of a situation. There is uncertainty about both favorable
and unfavorable events. The uncertainty must be understood in order to assess risk.

Value Engineering

A systematic effort to improve the value of goods or services utilizing an examination of the
function. Value can be increased by either improving the function or reducing cost while
preserving basic functions.

Variable Cost

Costs that change in proportion to the activity of the effort. The concept is useful in forecasting
the impact of performance when planned baselines are not achieved.

Work Breakdown Structure (WBS)

A means of organizing all project or program components into a product-oriented structure that
can be used to establish work packages for project cost and schedule baselines.

Wrap Rate

In NASA cost estimating language, major relatively fixed-cost components such as project
management, systems engineering, and safety and mission assurance are referred to as wraps.
The components of the wrap rate will vary from model to model. In many parametric cost models,
the cost of these elements is calculated as a function of the cost of the hardware and software.

FileAction
NASA-CEH-APP-Q Appendix Q; Glossary.pdfDownload 
17,005 Documents in our Technical Library
2464424 Total Downloads

Search The Technical Library

Newest Additions

NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
AA-CP-20212-001
AA-CP-20212-001
ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...