17,005 Documents in our Technical Library
2449603 Total Downloads

Newest Additions

NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
AA-CP-20212-001
AA-CP-20212-001
ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...

NASA-CEH-APP-L

NASA-CEH-APP-L
  • Version
  • 189 Downloads
  • 1.16 MB File Size
  • 1 File Count
  • August 14, 2016 Create Date
  • August 14, 2016 Last Updated
Scroll for Details

Appendix L; Estimating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE)

NASA-CEH-APP-L Appendix L; Estigmating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE)

Appendix L: Estimating the Cost of Construction of
Facilities (CoF) and Ground Support Equipment (GSE)

Estimating facility costs is a specialized type of cost estimating.1 The acquisition and development of real
property is governed by Federal statute, with additional guidance and requirements levied in Office of
Management and Budget (OMB) Circulars, such as A-11 and A-94. NASA directives and requirements,
largely found in the NASA Online Directives Information System (NODIS) as part of the 8800 series of
directives, also provide useful information.

The estimator should work closely with the Center facilities organization to ensure that estimates are
complete and in compliance with these statutes and directives. This appendix provides estimating
techniques and rules of thumb that were developed for application at the Kennedy Space Center (KSC).
The techniques can be used as examples to assist the estimator in collecting and analyzing local data
and as estimating tools and references appropriate for use at each respective installation.

The following topics are described in this appendix:

L.1. CoF and GSE Overview
L.1.1. COF Types and Affected Ground Support Equipment
L.2. Facility Funding Types
L.2.1. Non-CoF Funding
L.2.2. Facility Planning and Design (FP&D) Funding
L.2.3. Phasing of Funds
L.3. Estimating CoF and GSE Projects
L.3.1. Conceptual Parametric Estimates
L.3.2. BOE
L.4. Historical Information
L.4.1. Historical Cost and Schedule Data
L.4.2. Historical Schedule Growth
L.4.3. Historical Cost Growth

L.5. Conclusion

1 G. C. Butts, “Accurate Estimates in Less Than a Minute,” presented at the AACE International Conference, Las Vegas, NV, 2006.

Appendix L
Estimating the Cost of GOP and GSE L-1 February 2015
NASA Cost Estimating Handbook Version 4.0

L1. CoF and GSE Overview

It can be difficult to estimate costs for 00F and GSE due to many factors, including numerous variations
of types, sizes, unique features, site location, site conditions, economic conditions, and local
infrastructure capability. Federal law and NASA Facility Project Requirements, including NASA
Procedural Directive (NPD) 8820.2D, dictate a rigid budget process for CoF projects that requires that
CoF funding requests be submitted years before the design has been completed or final requirements are
known. Figure L-1 captures the funding process. For more specific details on NASA policy and the CoF
process, refer to NPD 8820.2D at http://nodi33.qsfc.nasa.qov/lib docs.cfm?ranqe=8.

FileAction
NASA-CEH-APP-L Appendix L; Estimating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE).pdfDownload 

Comment On This Post

Your email address will not be published. Required fields are marked *

NASA-CEH-APP-L

NASA-CEH-APP-L
  • Version
  • 189 Downloads
  • 1.16 MB File Size
  • 1 File Count
  • August 14, 2016 Create Date
  • August 14, 2016 Last Updated
Scroll for Details

Appendix L; Estimating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE)

NASA-CEH-APP-L Appendix L; Estigmating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE)

Appendix L: Estimating the Cost of Construction of
Facilities (CoF) and Ground Support Equipment (GSE)

Estimating facility costs is a specialized type of cost estimating.1 The acquisition and development of real
property is governed by Federal statute, with additional guidance and requirements levied in Office of
Management and Budget (OMB) Circulars, such as A-11 and A-94. NASA directives and requirements,
largely found in the NASA Online Directives Information System (NODIS) as part of the 8800 series of
directives, also provide useful information.

The estimator should work closely with the Center facilities organization to ensure that estimates are
complete and in compliance with these statutes and directives. This appendix provides estimating
techniques and rules of thumb that were developed for application at the Kennedy Space Center (KSC).
The techniques can be used as examples to assist the estimator in collecting and analyzing local data
and as estimating tools and references appropriate for use at each respective installation.

The following topics are described in this appendix:

L.1. CoF and GSE Overview
L.1.1. COF Types and Affected Ground Support Equipment
L.2. Facility Funding Types
L.2.1. Non-CoF Funding
L.2.2. Facility Planning and Design (FP&D) Funding
L.2.3. Phasing of Funds
L.3. Estimating CoF and GSE Projects
L.3.1. Conceptual Parametric Estimates
L.3.2. BOE
L.4. Historical Information
L.4.1. Historical Cost and Schedule Data
L.4.2. Historical Schedule Growth
L.4.3. Historical Cost Growth

L.5. Conclusion

1 G. C. Butts, “Accurate Estimates in Less Than a Minute,” presented at the AACE International Conference, Las Vegas, NV, 2006.

Appendix L
Estimating the Cost of GOP and GSE L-1 February 2015
NASA Cost Estimating Handbook Version 4.0

L1. CoF and GSE Overview

It can be difficult to estimate costs for 00F and GSE due to many factors, including numerous variations
of types, sizes, unique features, site location, site conditions, economic conditions, and local
infrastructure capability. Federal law and NASA Facility Project Requirements, including NASA
Procedural Directive (NPD) 8820.2D, dictate a rigid budget process for CoF projects that requires that
CoF funding requests be submitted years before the design has been completed or final requirements are
known. Figure L-1 captures the funding process. For more specific details on NASA policy and the CoF
process, refer to NPD 8820.2D at http://nodi33.qsfc.nasa.qov/lib docs.cfm?ranqe=8.

FileAction
NASA-CEH-APP-L Appendix L; Estimating the Cost of Construction of Facilities (CoF) and Ground Support Equipment (GSE).pdfDownload 
17,005 Documents in our Technical Library
2449603 Total Downloads

Search The Technical Library

Newest Additions

NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
NASA-RP-1060 Subsonic Aircraft: Evolution and the Matching of Size to Performance
AA-CP-20212-001
AA-CP-20212-001
ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...