17,003 Documents in our Technical Library
1361488 Total Downloads

Newest Additions

ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...
MIL-R-7885D General Specification for Rivets, Blind, Structural, Mechanically Locked Spindle and Friction Locked Spindle
This specification covers mechanically locked spindle and  friction locked spindle ...
MIL-HDBK-132A Protective Finishes for Metal and Wood Surfaces
The primary object of this handbook is to provide a ...

AA-SM-010

AA-SM-010
  • Version
  • 788 Downloads
  • 106.40 KB File Size
  • 3 File Count
  • March 2, 2016 Create Date
  • March 2, 2016 Last Updated
Scroll for Details

AA-SM-010 Stress Due to Interference fit bushing installation

Free Engineering Spreadsheets: Stress Due to Interference fit bushing installation. Note that the spreadsheet cells with blue ink are the input values - all other cells are either text or values generated by the spreadsheet

AA-SM-010

 


31 August 2016 - Rev A added, added links and included general corrections and improvements

31 August 2017 - Rev B added. Added different material strengths for lug and bushing and improved layout

Comment On This Post

Your email address will not be published. Required fields are marked *

FileAction
AA-SM-010 Stress Due to Interference fit bushing installation - Rev B.xlsxDownload 
AA-SM-010 Stress Due to Interference fit bushing installation - Rev A.xlsxDownload 
AA-SM-010 Stress Due to Interference fit bushing installation.xlsxDownload 

AA-SM-010

AA-SM-010
  • Version
  • 788 Downloads
  • 106.40 KB File Size
  • 3 File Count
  • March 2, 2016 Create Date
  • March 2, 2016 Last Updated
Scroll for Details

AA-SM-010 Stress Due to Interference fit bushing installation

Free Engineering Spreadsheets: Stress Due to Interference fit bushing installation. Note that the spreadsheet cells with blue ink are the input values - all other cells are either text or values generated by the spreadsheet

AA-SM-010

 


31 August 2016 - Rev A added, added links and included general corrections and improvements

31 August 2017 - Rev B added. Added different material strengths for lug and bushing and improved layout

FileAction
AA-SM-010 Stress Due to Interference fit bushing installation - Rev B.xlsxDownload 
AA-SM-010 Stress Due to Interference fit bushing installation - Rev A.xlsxDownload 
AA-SM-010 Stress Due to Interference fit bushing installation.xlsxDownload 
17,003 Documents in our Technical Library
1361488 Total Downloads

Search The Technical Library

Newest Additions

ADPO10769 Occurrence of Corrosion in Airframes
The purpose of this lecture is to provide an overview ...
MIL-STD-1759 Rivets and Rivet Type Fasteners Preferred for Design
The purpose of this book form standard is to provide ...
MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests
This standard contains materiel acquisition program planning and engineering direction ...
MIL-R-7885D General Specification for Rivets, Blind, Structural, Mechanically Locked Spindle and Friction Locked Spindle
This specification covers mechanically locked spindle and  friction locked spindle ...
MIL-HDBK-132A Protective Finishes for Metal and Wood Surfaces
The primary object of this handbook is to provide a ...